Ggplot2 Change Order of Continuous X Axis
ggplot2 axis scales and transformations
- Prepare the data
- Example of plots
- Change x and y axis limits
- Use xlim() and ylim() functions
- Use expand_limts() function
- Use scale_xx() functions
- Axis transformations
- Log and sqrt transformations
- Format axis tick mark labels
- Display log tick marks
- Format date axes
- Example of data
- Create some time serie data
- Plot with dates
- Format axis tick mark labels
- Date axis limits
- Go further
- Infos
This R tutorial describes how to modify x and y axis limits (minimum and maximum values) using ggplot2 package. Axis transformations (log scale, sqrt, …) and date axis are also covered in this article.
Prepare the data
ToothGrowth data is used in the following examples :
# Convert dose column dose from a numeric to a factor variable ToothGrowth$dose <- as.factor(ToothGrowth$dose) head(ToothGrowth) ## len supp dose ## 1 4.2 VC 0.5 ## 2 11.5 VC 0.5 ## 3 7.3 VC 0.5 ## 4 5.8 VC 0.5 ## 5 6.4 VC 0.5 ## 6 10.0 VC 0.5 Make sure that dose column is converted as a factor using the above R script.
Example of plots
library(ggplot2) # Box plot bp <- ggplot(ToothGrowth, aes(x=dose, y=len)) + geom_boxplot() bp # scatter plot sp<-ggplot(cars, aes(x = speed, y = dist)) + geom_point() sp
Change x and y axis limits
There are different functions to set axis limits :
- xlim() and ylim()
- expand_limits()
- scale_x_continuous() and scale_y_continuous()
Use xlim() and ylim() functions
To change the range of a continuous axis, the functions xlim() and ylim() can be used as follow :
# x axis limits sp + xlim(min, max) # y axis limits sp + ylim(min, max) min and max are the minimum and the maximum values of each axis.
# Box plot : change y axis range bp + ylim(0,50) # scatter plots : change x and y limits sp + xlim(5, 40)+ylim(0, 150)
Use expand_limts() function
Note that, the function expand_limits() can be used to :
- quickly set the intercept of x and y axes at (0,0)
- change the limits of x and y axes
# set the intercept of x and y axis at (0,0) sp + expand_limits(x=0, y=0) # change the axis limits sp + expand_limits(x=c(0,30), y=c(0, 150))
Use scale_xx() functions
It is also possible to use the functions scale_x_continuous() and scale_y_continuous() to change x and y axis limits, respectively.
The simplified formats of the functions are :
scale_x_continuous(name, breaks, labels, limits, trans) scale_y_continuous(name, breaks, labels, limits, trans) - name : x or y axis labels
- breaks : to control the breaks in the guide (axis ticks, grid lines, …). Among the possible values, there are :
- NULL : hide all breaks
- waiver() : the default break computation
- a character or numeric vector specifying the breaks to display
- labels : labels of axis tick marks. Allowed values are :
- NULL for no labels
- waiver() for the default labels
- character vector to be used for break labels
- limits : a numeric vector specifying x or y axis limits (min, max)
- trans for axis transformations. Possible values are "log2", "log10", …
The functions scale_x_continuous() and scale_y_continuous() can be used as follow :
# Change x and y axis labels, and limits sp + scale_x_continuous(name="Speed of cars", limits=c(0, 30)) + scale_y_continuous(name="Stopping distance", limits=c(0, 150))
Axis transformations
Log and sqrt transformations
Built in functions for axis transformations are :
- scale_x_log10(), scale_y_log10() : for log10 transformation
- scale_x_sqrt(), scale_y_sqrt() : for sqrt transformation
- scale_x_reverse(), scale_y_reverse() : to reverse coordinates
- coord_trans(x ="log10", y="log10") : possible values for x and y are "log2", "log10", "sqrt", …
- scale_x_continuous(trans='log2'), scale_y_continuous(trans='log2') : another allowed value for the argument trans is 'log10'
These functions can be used as follow :
# Default scatter plot sp <- ggplot(cars, aes(x = speed, y = dist)) + geom_point() sp # Log transformation using scale_xx() # possible values for trans : 'log2', 'log10','sqrt' sp + scale_x_continuous(trans='log2') + scale_y_continuous(trans='log2') # Sqrt transformation sp + scale_y_sqrt() # Reverse coordinates sp + scale_y_reverse()
The function coord_trans() can be used also for the axis transformation
# Possible values for x and y : "log2", "log10", "sqrt", ... sp + coord_trans(x="log2", y="log2")
Format axis tick mark labels
Axis tick marks can be set to show exponents. The scales package is required to access break formatting functions.
# Log2 scaling of the y axis (with visually-equal spacing) library(scales) sp + scale_y_continuous(trans = log2_trans()) # show exponents sp + scale_y_continuous(trans = log2_trans(), breaks = trans_breaks("log2", function(x) 2^x), labels = trans_format("log2", math_format(2^.x)))
Note that many transformation functions are available using the scales package : log10_trans(), sqrt_trans(), etc. Use help(trans_new) for a full list.
Format axis tick mark labels :
library(scales) # Percent sp + scale_y_continuous(labels = percent) # dollar sp + scale_y_continuous(labels = dollar) # scientific sp + scale_y_continuous(labels = scientific)
Display log tick marks
It is possible to add log tick marks using the function annotation_logticks().
Note that, these tick marks make sense only for base 10
The Animals data sets, from the package MASS, are used :
library(MASS) head(Animals) ## body brain ## Mountain beaver 1.35 8.1 ## Cow 465.00 423.0 ## Grey wolf 36.33 119.5 ## Goat 27.66 115.0 ## Guinea pig 1.04 5.5 ## Dipliodocus 11700.00 50.0 The function annotation_logticks() can be used as follow :
library(MASS) # to access Animals data sets library(scales) # to access break formatting functions # x and y axis are transformed and formatted p2 <- ggplot(Animals, aes(x = body, y = brain)) + geom_point() + scale_x_log10(breaks = trans_breaks("log10", function(x) 10^x), labels = trans_format("log10", math_format(10^.x))) + scale_y_log10(breaks = trans_breaks("log10", function(x) 10^x), labels = trans_format("log10", math_format(10^.x))) + theme_bw() # log-log plot without log tick marks p2 # Show log tick marks p2 + annotation_logticks()
Note that, default log ticks are on bottom and left.
To specify the sides of the log ticks :
# Log ticks on left and right p2 + annotation_logticks(sides="lr") # All sides p2+annotation_logticks(sides="trbl") Allowed values for the argument sides are :
- t : for top
- r : for right
- b : for bottom
- l : for left
- the combination of t, r, b and l
Format date axes
The functions scale_x_date() and scale_y_date() are used.
Example of data
Create some time serie data
df <- data.frame( date = seq(Sys.Date(), len=100, by="1 day")[sample(100, 50)], price = runif(50) ) df <- df[order(df$date), ] head(df) ## date price ## 33 2016-09-21 0.07245190 ## 3 2016-09-23 0.51772443 ## 23 2016-09-25 0.05758921 ## 43 2016-09-26 0.99389551 ## 45 2016-09-27 0.94858770 ## 29 2016-09-28 0.82420890 Plot with dates
# Plot with date dp <- ggplot(data=df, aes(x=date, y=price)) + geom_line() dp
Format axis tick mark labels
Load the package scales to access break formatting functions.
library(scales) # Format : month/day dp + scale_x_date(labels = date_format("%m/%d")) + theme(axis.text.x = element_text(angle=45)) # Format : Week dp + scale_x_date(labels = date_format("%W")) # Months only dp + scale_x_date(breaks = date_breaks("months"), labels = date_format("%b"))
Note that, since ggplot2 v2.0.0, date and datetime scales now have date_breaks, date_minor_breaks and date_labels arguments so that you never need to use the long scales::date_breaks() or scales::date_format().
Date axis limits
US economic time series data sets (from ggplot2 package) are used :
head(economics) ## date pce pop psavert uempmed unemploy ## 1 1967-07-01 507.4 198712 12.5 4.5 2944 ## 2 1967-08-01 510.5 198911 12.5 4.7 2945 ## 3 1967-09-01 516.3 199113 11.7 4.6 2958 ## 4 1967-10-01 512.9 199311 12.5 4.9 3143 ## 5 1967-11-01 518.1 199498 12.5 4.7 3066 ## 6 1967-12-01 525.8 199657 12.1 4.8 3018 Create the plot of psavert by date :
- date : Month of data collection
- psavert : personal savings rate
# Plot with dates dp <- ggplot(data=economics, aes(x=date, y=psavert)) + geom_line() dp # Axis limits c(min, max) min <- as.Date("2002-1-1") max <- max(economics$date) dp+ scale_x_date(limits = c(min, max))
Go further
See also the function scale_x_datetime() and scale_y_datetime() to plot a data containing date and time.
Infos
This analysis has been performed using R software (ver. 3.2.4) and ggplot2 (ver. )
Enjoyed this article? I'd be very grateful if you'd help it spread by emailing it to a friend, or sharing it on Twitter, Facebook or Linked In.
Show me some love with the like buttons below... Thank you and please don't forget to share and comment below!!
Avez vous aimé cet article? Je vous serais très reconnaissant si vous aidiez à sa diffusion en l'envoyant par courriel à un ami ou en le partageant sur Twitter, Facebook ou Linked In.
Montrez-moi un peu d'amour avec les like ci-dessous ... Merci et n'oubliez pas, s'il vous plaît, de partager et de commenter ci-dessous!
Recommended for You!
Recommended for you
This section contains best data science and self-development resources to help you on your path.
Want to Learn More on R Programming and Data Science?
Follow us by Email
On Social Networks:
Get involved :
Click to follow us on Facebook and Google+ :
Comment this article by clicking on "Discussion" button (top-right position of this page)
Source: http://www.sthda.com/english/wiki/ggplot2-axis-scales-and-transformations